Calvin Reese, superintendent · Example Job: Retail Lot Expansion
What Julia captured
- Interior floor tiles are cracking along a control joint. They need replacing or a matching comp.
- The dirt hauler delivered 28 loads, then called its trucks off when another job shut down.
- Curb prep is done out front and inside. The rest finishes tomorrow.
- The gas line has to be hand-dug 5 to 6 inches deeper or jumped. Electricians need the answer first thing tomorrow.